SR 4019 over ARCH SPRING RUN

.1 MI.N.OF UNION FURNACE · County 061, Pennsylvania · Built 1922 · 2 Lanes · 57 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
000000000018890
Year Built
1922
Length
8.2 m (26.9 ft)
Max Span
7.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
57
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$43,000
Total Project Cost
$575,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.