PA TPK (I-76) over T-430

NEAR FORT LITTLETON · County 057, Pennsylvania · Built 1939 · 4 Lanes · 21,197 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000017970
Year Built
1939
Reconstructed
1997
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
21,197
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$16,000
Total Project Cost
$219,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.