I-70 WBL over MCKEES RUN

AMARANTH EXIT · County 057, Pennsylvania · Built 1960 · 2 Lanes · 6,085 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000017801
Year Built
1960
Reconstructed
2011
Length
13.4 m (44 ft)
Max Span
12.8 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
6,085
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.