I-70 EBL over SR 915&3023; L.BRUSH CRK

OVER PA 915 AT EXIT 151 · County 057, Pennsylvania · Built 1963 · 2 Lanes · 5,976 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000017783
Year Built
1963
Reconstructed
2004
Length
79.9 m (262.1 ft)
Max Span
25.9 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
5,976
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$241,000
Total Project Cost
$3,254,000