PA TPK (I-76) over T-575
FANNETT TWP. · County 055, Pennsylvania · Built 1939 · 4 Lanes · 21,433 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
40.144603, -77.723739
This bridge is in worse condition than 31.8% of bridges in County 055. The average bridge in Pennsylvania is 0 years old; this one is 87 years old.
Nearby Bridges
NEW BRIDGE ROAD over CONOCOCHEAGUE CREEK W.BR
Built 1964
PA TPK (I-76) over SR 4006 LR264A
Built 2000
T-572 MILL ROAD over CONOCOCHEAGUE CRK. W.BR.
Built 1964
DRY RUN ROAD over DRY RUN
Built 1930
PA 75; Path Valley over DRY RUN
Built 1953
PA 75; Path Valley over TRIB OF DRY RUN
Built 1953
T-568 DRY RUN ROAD over DRY RUN
Built 1959
PA 641; Timmons Rd over Dry Run
Built 1933
SR 4007 . over DRY RUN
Built 1934
SR 4006 Cold spr. over PA TURNPIKE
Built 2007
Bridge Details
- Structure #
- 000000000017623
- Year Built
- 1939
- Reconstructed
- 1992
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.3 m
- Width
- 26.1 m (85.6 ft)
- Lanes
- 4
- Daily Traffic
- 21,433
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $11,000
- Total Project Cost
- $146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.