SR 4010 HERSHEY RD over OVER SR 79 NB/SB

SUMMIT TOWNSHIP · County 049, Pennsylvania · Built 1965 · 2 Lanes · 3,244 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000016367
Year Built
1965
Length
90.2 m (295.9 ft)
Max Span
22.6 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
3,244
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$53,000
Total Project Cost
$711,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.