RAMP M2;NB ON over PADOT STOCK PILE;CRUM CK
JUNCTION W/I-476 43K01 · County 045, Pennsylvania · Built 1975 · 2 Lanes · 31,439 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.867603, -75.341708
This bridge is in worse condition than 31.9% of bridges in County 045. The average bridge in Pennsylvania is 0 years old; this one is 51 years old.
Nearby Bridges
INTERSTATE 95(NB) over CRUM CREEK
Built 1975
INTERSTATE 95(SB) over CRUM CREEK
Built 1975
CHESTER PIKE over CRUM CREEK
Built 1926
INTERSTATE 95(NB) over RAMP M2 TO I95 (NB)
Built 1975
INTERSTATE 95(SB) over RAMP M2 TO I-95 NB
Built 1975
MID-COUNTY EXWY.SB over RAMP 3 TO I-95 (NB)
Built 1987
INTERSTATE 95(NB) over CHESTER PIKE
Built 1975
INTERSTATE 95(SB) over CHESTER PIKE
Built 1975
INTERSTATE 95 over BULLENS LANE (TURNBACK)
Built 1975
INTERSTATE 95(NB) over AMTRAK
Built 1975
Bridge Details
- Structure #
- 000000000015485
- Year Built
- 1975
- Reconstructed
- 1988
- Length
- 123.1 m (403.9 ft)
- Max Span
- 33.5 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 31,439
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.