UPLAND ROAD over CHESTER CREEK
.2MI.NORTH I-95 35-A1 · County 045, Pennsylvania · Built 1967 · 2 Lanes · 236 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
39.850083, -75.386364
This bridge is in worse condition than 13.9% of bridges in County 045. The average bridge in Pennsylvania is 0 years old; this one is 59 years old.
Nearby Bridges
I-95 RAMPS R&S SB over SEPTA(TRACKS REMOVED)
Built 1976
INTERSTATE 95 over SEPTA (NOT ACTIVE)
Built 1964
RAMP F S.B. TO BAR over RAMP E TO S.B.I-95
Built 1976
INTERSTATE 95 over RAMP E &RAMP F TO BARRY
Built 1977
CONCORD ROAD over SEPTA(NOT ACTIVE BURIED)
Built 2015
ENGLE STREET over INTERSTATE 95;BETHEL RD.
Built 1968
KERLIN STREET over CHESTER CREEK
Built 1922
INTERSTATE 95 over KERLIN STREET
Built 1964
RAMP B COMM BARRY over SEVENTH STREET
Built 1974
RAMP A COMM BARRY over SEVENTH ST;FLOWER STREET
Built 1974
Bridge Details
- Structure #
- 000000000015379
- Year Built
- 1967
- Length
- 22.3 m (73.2 ft)
- Max Span
- 22.3 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 236
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $82,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.