GOSHEN ROAD over DARBY CREEK

RADNOR TOWNSHIP 25F03 · County 045, Pennsylvania · Built 1905 · 2 Lanes · 7,453 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000015204
Year Built
1905
Reconstructed
2011
Length
29.3 m (96.1 ft)
Max Span
13.4 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
7,453
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$78,000
Total Project Cost
$1,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.