WALNUT ST over JONESTOWN ROAD HARRISBUR

WLNT ST OVER JONSTN R/HBG · County 043, Pennsylvania · Built 1914 · 1 Lanes · 200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000014741
Year Built
1914
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
6.2 m (20.3 ft)
Lanes
1
Daily Traffic
200
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$65,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.