SR 3009 over PAXTON CREEK

PAXTON ST HBG · County 043, Pennsylvania · Built 1930 · 4 Lanes · 18,893 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000014515
Year Built
1930
Length
12.5 m (41 ft)
Max Span
10.7 m
Width
24.5 m (80.4 ft)
Lanes
4
Daily Traffic
18,893
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$30,000
Total Project Cost
$399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.