WEST ORANGE STREET over MIDDLE SPRING CREEK

0.1 M SW OF US 11/PA 696 · County 041, Pennsylvania · Built 1977 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000014126
Year Built
1977
Reconstructed
1999
Length
9.4 m (30.8 ft)
Max Span
8.5 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$7,000
Total Project Cost
$99,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.