T-425 DEETER H.RD. over OVER LT.SUGAR CREEK

2.5 MI.S.OF FAUNCETOWN · County 039, Pennsylvania · Built 1950 · 1 Lanes · 250 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
8
Very Good
Substructure
4
Poor

Bridge Details

Structure #
000000000013491
Year Built
1950
Reconstructed
2009
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
250
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$32,000
Total Project Cost
$432,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.