SR 618 over OVER INLET RUN TRIB

SUMMIT TOWNSHIP · County 039, Pennsylvania · Built 1927 · 2 Lanes · 2,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000013133
Year Built
1927
Reconstructed
2008
Length
26.5 m (86.9 ft)
Max Span
25.3 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
2,300
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$28,000
Total Project Cost
$380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.