SR 408 THOMPSON ST over OVER OIL CREEK

HYDETOWN BOROUGH · County 039, Pennsylvania · Built 1930 · 2 Lanes · 1,634 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
000000000013127
Year Built
1930
Reconstructed
2023
Length
56.7 m (186 ft)
Max Span
28.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,634
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$69,000
Total Project Cost
$934,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.