T-326 CTY BR 28 over MUGSER RUN

5 MI SW OF CATAWISSA · County 037, Pennsylvania · Built 1905 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000012780
Year Built
1905
Reconstructed
2011
Length
16.8 m (55.1 ft)
Max Span
15.5 m
Width
4.1 m (13.5 ft)
Lanes
1
Daily Traffic
50
Material
Wood or Timber
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$149,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.