SR 2024 over SUGAR RUN

BEECH CREEK · County 035, Pennsylvania · Built 1954 · 2 Lanes · 460 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000012368
Year Built
1954
Length
8.2 m (26.9 ft)
Max Span
7.9 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
460
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$29,000
Total Project Cost
$389,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.