SR 80-I 80 over SANDY LICK CR/BUFF& PITT

ONE-HALF MI E EXIT 101 · County 033, Pennsylvania · Built 1967 · 2 Lanes · 10,674 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000011272
Year Built
1967
Reconstructed
1988
Length
80.2 m (263.1 ft)
Max Span
25.6 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
10,674
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$76,000
Total Project Cost
$1,023,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.