SR 0080 EB over SR 2015 & ABAND RR

HENDERSON EB · County 031, Pennsylvania · Built 1966 · 2 Lanes · 10,785 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000010961
Year Built
1966
Reconstructed
2021
Length
54.3 m (178.1 ft)
Max Span
25.6 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
10,785
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,000
Total Project Cost
$261,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.