SR 0080 EB&WB over ALLEGHENY RIV;SR0268;RR

EMLENTON · County 031, Pennsylvania · Built 1966 · 4 Lanes · 22,928 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000010930
Year Built
1966
Reconstructed
2013
Length
510.5 m (1674.9 ft)
Max Span
164.6 m
Width
20.8 m (68.2 ft)
Lanes
4
Daily Traffic
22,928
Material
Steel Continuous
Design
Truss - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$782,000
Total Project Cost
$10,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.