SOUTHRIDGE DRIVE over WEST BR. RED CLAY CREEK

0.42 MI TO SR 82 3801-J10 · County 029, Pennsylvania · Built 1963 · 2 Lanes · 415 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000010794
Year Built
1963
Reconstructed
1992
Length
11.3 m (37.1 ft)
Max Span
10.4 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
415
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$6,000
Total Project Cost
$75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.