PA TPK (I-76) over SR1005 LR 15050

EAST OF CEDAR HOLLOW · County 029, Pennsylvania · Built 1950 · 4 Lanes · 47,120 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000010756
Year Built
1950
Length
16.5 m (54.1 ft)
Max Span
15.2 m
Width
22.3 m (73.2 ft)
Lanes
4
Daily Traffic
47,120
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$23,000
Total Project Cost
$308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.