PAOLI PIKE over W. BR. RIDLEY CREEK

W. OF RTE. 352 32J5 · County 029, Pennsylvania · Built 1998 · 3 Lanes · 9,853 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000000010394
Year Built
1998
Length
12.2 m (40 ft)
Max Span
5.5 m
Width
17.6 m (57.7 ft)
Lanes
3
Daily Traffic
9,853
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$42,000
Total Project Cost
$561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.