ROUTE 202 (NB) over AMTRAK;RAMP EB;DUNWOODY

SOUTH OF RT. 30 22D11 · County 029, Pennsylvania · Built 1969 · 2 Lanes · 24,392 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000010113
Year Built
1969
Reconstructed
2018
Length
204.2 m (669.9 ft)
Max Span
40.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
24,392
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$207,000
Total Project Cost
$2,791,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.