POTTSTOWN PIKE over ROUTE 100

N OF BOOT ROAD 31K1 · County 029, Pennsylvania · Built 1968 · 1 Lanes · 5,774 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000010060
Year Built
1968
Reconstructed
2009
Length
64 m (210 ft)
Max Span
32.3 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
5,774
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$24,000
Total Project Cost
$321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.