T-353 over LICK ISLAND RUN

1200 FT NW OF PA 872 · County 023, Pennsylvania · Built 1945 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000008950
Year Built
1945
Reconstructed
2014
Length
12.8 m (42 ft)
Max Span
12.2 m
Width
5.2 m (17.1 ft)
Lanes
2
Daily Traffic
20
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$47,000
Total Project Cost
$638,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.