SR3018 over I-79 NB/SB & TR BRUSH CR

OGLE NO.1 · County 019, Pennsylvania · Built 1970 · 2 Lanes · 10,286 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000008089
Year Built
1970
Reconstructed
2005
Length
79.9 m (262.1 ft)
Max Span
30.5 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
10,286
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$113,000
Total Project Cost
$1,523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.