US 202 over AQUETONG CREEK

WEST OF NEW HOPE 25C03 · County 017, Pennsylvania · Built 1939 · 2 Lanes · 15,615 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000006935
Year Built
1939
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
15,615
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,000
Total Project Cost
$130,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.