SOUDERTON PIKE over MORRIS RUN

BLOOMING GLEN 15E13 · County 017, Pennsylvania · Built 1902 · 2 Lanes · 7,314 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000006887
Year Built
1902
Reconstructed
2011
Length
15.2 m (49.9 ft)
Max Span
6.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
7,314
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$45,000
Total Project Cost
$605,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.