SR 2010 over SOUTH BRANCH TOWANDA CRK

NEW ALBANY BORO · County 015, Pennsylvania · Built 1939 · 2 Lanes · 1,103 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006364
Year Built
1939
Reconstructed
2010
Length
19.5 m (64 ft)
Max Span
18.9 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,103
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.