SR 0220 over TURN BACK= T891

1 MI.N.OF TOWANDA BORO · County 015, Pennsylvania · Built 1974 · 2 Lanes · 3,410 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000006150
Year Built
1974
Reconstructed
2000
Length
87.8 m (288.1 ft)
Max Span
29.3 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
3,410
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,000
Total Project Cost
$599,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.