SR 4013 (SBL) over SR4009 8TH AVE NORFOLK S
ALTOONA 8TH ST.BRIDGE · County 013, Pennsylvania · Built 1973 · 2 Lanes · 7,141 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.51775, -78.395569
This bridge is in worse condition than 63% of bridges in County 013. The average bridge in Pennsylvania is 0 years old; this one is 53 years old.
Nearby Bridges
SR 4013 NBL over NORFOLK SO. RR & 8TH AVE
Built 2005
SR 4010 over SR 4009_NORFOLK SO. RR
Built 1973
SR 4009 (SBL) over PA 36 (UNION AVE)
Built 1975
10TH STREET over BRUSH RUN
Built 1976
12TH STREET over BRUSH RUN
Built 1976
13TH STREET over BRUSH RUN
Built 1975
14th STREET over BRUSH RUN
Built 2004
WEST 8TH AVENUE over SPRING RUN
Built 1993
WEST 9TH AVENUE over SPRING RUN
Built 1993
SR 4013 over SPRING RUN
Built 2003
Bridge Details
- Structure #
- 000000000005845
- Year Built
- 1973
- Reconstructed
- 2013
- Length
- 244.4 m (801.8 ft)
- Max Span
- 28.3 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 7,141
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $741,000
- Total Project Cost
- $10,002,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.