SR 2013 over CLOVER CREEK

1.5 MI.E.OF WILLIAMSBURG · County 013, Pennsylvania · Built 1956 · 2 Lanes · 840 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000005735
Year Built
1956
Reconstructed
2011
Length
27.4 m (89.9 ft)
Max Span
13.1 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
840
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$86,000
Total Project Cost
$1,164,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.