I-99 / US 220 NBL over SR 3013 C-101 RR JUN RIV

.5 MI.S.OF EAST FREEDOM · County 013, Pennsylvania · Built 1986 · 2 Lanes · 6,421 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005569
Year Built
1986
Reconstructed
2003
Length
232 m (761.2 ft)
Max Span
51.8 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
6,421
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.