PA 36 over 2014;NORFS;EV RR JNTA ST

HOLLIDAYSBURG · County 013, Pennsylvania · Built 1966 · 2 Lanes · 8,205 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000005556
Year Built
1966
Reconstructed
2023
Length
165.8 m (544 ft)
Max Span
24.7 m
Width
21 m (68.9 ft)
Lanes
2
Daily Traffic
8,205
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$722,000
Total Project Cost
$9,742,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.