PA 724 (LR 147) over ALLEGHENY CREEK

MAIN STREET GIBRALTAR · County 011, Pennsylvania · Built 1956 · 2 Lanes · 10,331 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
000000000004927
Year Built
1956
Length
22.3 m (73.2 ft)
Max Span
21.6 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
10,331
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$198,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.