SR 61(LR 160) over LAUREL RUN

2 MI N OF READING · County 011, Pennsylvania · Built 1939 · 3 Lanes · 18,699 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000004588
Year Built
1939
Reconstructed
2016
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
18,699
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,000
Total Project Cost
$82,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.