T-453; DIEHL RD. over PA TPK (I-76)

NEAR SR30 & SR31 · County 009, Pennsylvania · Built 1939 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000004417
Year Built
1939
Length
26.5 m (86.9 ft)
Max Span
23.8 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.