PA 56 over I-99 / US 220

0.7 MILE SOUTH OF CESSNA · County 009, Pennsylvania · Built 1969 · 2 Lanes · 2,773 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000004021
Year Built
1969
Reconstructed
2006
Length
132 m (433.1 ft)
Max Span
39.6 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
2,773
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$269,000
Total Project Cost
$3,627,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.