RAMP E over SR 0065 NB

OVER SR 65 NB · County 007, Pennsylvania · Built 1963 · 1 Lanes · 2,246 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000003925
Year Built
1963
Reconstructed
2019
Length
204.8 m (671.9 ft)
Max Span
18.6 m
Width
7.5 m (24.6 ft)
Lanes
1
Daily Traffic
2,246
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$37,000
Total Project Cost
$497,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.