SHIPPINGPORT HI RD over SERVICE ROAD NUC PLANT

AT POWER PLANT · County 007, Pennsylvania · Built 1962 · 2 Lanes · 4,489 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000003592
Year Built
1962
Reconstructed
2009
Length
36.6 m (120.1 ft)
Max Span
13.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
4,489
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$56,000
Total Project Cost
$753,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.