SR0028 NB&SB over ABANDONED RR

BUFFALO CREEK · County 005, Pennsylvania · Built 1969 · 4 Lanes · 14,293 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002944
Year Built
1969
Reconstructed
2009
Length
452.6 m (1484.9 ft)
Max Span
99.1 m
Width
26.4 m (86.6 ft)
Lanes
4
Daily Traffic
14,293
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$151,000
Total Project Cost
$2,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.