RAMP A over RAMP C SB

28 N.B. RP. TO HIGH.PK.BR · County 003, Pennsylvania · Built 1960 · 1 Lanes · 6,461 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002848
Year Built
1960
Reconstructed
2022
Length
250.5 m (821.9 ft)
Max Span
23.5 m
Width
10.5 m (34.4 ft)
Lanes
1
Daily Traffic
6,461
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$42,000
Total Project Cost
$561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.