RAMP B over RAMP U BRIDGE ST PINE CR

TR8-S.B.RAMP TO 28 · County 003, Pennsylvania · Built 1963 · 1 Lanes · 8,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000002831
Year Built
1963
Reconstructed
2005
Length
172.2 m (565 ft)
Max Span
33.2 m
Width
7.5 m (24.6 ft)
Lanes
1
Daily Traffic
8,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$141,000
Total Project Cost
$1,899,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.