RAMP N over RPS A&B (F&G) MON

Fort Pitt Bridge · County 003, Pennsylvania · Built 1959 · 2 Lanes · 2,112 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002814
Year Built
1959
Reconstructed
2000
Length
54.9 m (180.1 ft)
Max Span
20.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,112
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$124,000
Total Project Cost
$1,677,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.