SIXTH STREET BR over 10TH ST BYPASS ALLEGH RV

AL02 6 ST TO NORTH SIDE · County 003, Pennsylvania · Built 1928 · 4 Lanes · 12,824 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000002381
Year Built
1928
Reconstructed
2023
Length
303.3 m (995.1 ft)
Max Span
131.1 m
Width
11.6 m (38.1 ft)
Lanes
4
Daily Traffic
12,824
Material
Steel Continuous
Design
Suspension
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$258,000
Total Project Cost
$3,488,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.