PA TPK (I-76) over SR 0008 LR72

HAMPTON-TPK RP.AB O/TRE 8 · County 003, Pennsylvania · Built 1950 · 2 Lanes · 8,559 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002065
Year Built
1950
Reconstructed
1995
Length
27.7 m (90.9 ft)
Max Span
26.2 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
8,559
Material
Steel
Design
Girder and Floorbeam System
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$64,000
Total Project Cost
$869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.