NORTH BRANCH RD over NORTH BRANCH ROBINSON RN

200 S.W. OF SR 3051 · County 003, Pennsylvania · Built 1934 · 2 Lanes · 3,452 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001883
Year Built
1934
Reconstructed
2004
Length
9.8 m (32.2 ft)
Max Span
8.8 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
3,452
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$56,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.