SANTIAGO ROAD over MONTOUR RUN
SANTIAGO NEAR SR 0030 · County 003, Pennsylvania · Built 1955 · 2 Lanes · 1,952 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
40.450556, -80.251333
This bridge is in worse condition than 91.2% of bridges in County 003. The average bridge in Pennsylvania is 0 years old; this one is 71 years old.
Nearby Bridges
SANTIAGO RD over SOUTH FORK MONTOUR RUN
Built 1991
LINCOLN HWY(US 30) over Montour Run
Built 2016
IMPERIAL-BURGTN RD over MONTOUR RUN NORTH FORK
Built 1958
ENLOW ROAD over MONTOUR RUN NORTH BRANCH
Built 1934
MAIN STREET over MONTOUR RUN
Built 1950
ENLOW RD over MONTOUR RUN
Built 1934
CALIFORNIA HOLLOW over MONTOUR RUN
Built 1930
MCCLAREN ROAD over BRANCH OF MONTOUR RUN
Built 1948
RT 0022 EB WB over SR 0978
Built 1966
RT 0022 EB WB over TWP RD 873 PARTRIDGE LN
Built 1964
Bridge Details
- Structure #
- 000000000001823
- Year Built
- 1955
- Length
- 9.8 m (32.2 ft)
- Max Span
- 8.5 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 1,952
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,000
- Total Project Cost
- $123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.