376 EB-WB over POPLAR AVENUE

GREENTREE INTERCHANGE · County 003, Pennsylvania · Built 1952 · 5 Lanes · 87,163 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000000988
Year Built
1952
Reconstructed
2016
Length
35.1 m (115.2 ft)
Max Span
14.3 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
87,163
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$51,000
Total Project Cost
$683,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.